Kitchen Remodeling · South Shore, MA

Layout first. Finishes second.

A kitchen built around how your family actually uses it: where you prep, where people stand, where the light comes from. Then the cabinets, counters and tile.

Construction6–12 weeks
Planning range$55k – $150k+
PermitsBuilding + trades
Lead timeCabinets 4–10 wks

Start here

The layout decides whether the kitchen works

Most South Shore kitchens we open up were built in the 1950s–1980s as closed rooms. The most valuable change is usually not a countertop. It is moving a wall, a window or the sink so the room works for how people cook and gather now.

We start with how you use the space, check what is in the walls (plumbing stacks, ductwork, bearing loads), and only then talk about finishes. That order is what keeps the budget from moving during the job.

Remodeled open kitchen with island on the South Shore

Scope

Three levels of kitchen remodel

Knowing which one you are planning is the fastest way to a realistic budget.

Refresh

Same layout, new kitchen

Cabinets, counters, backsplash, lighting and appliances replaced in the existing footprint.

  • Plumbing and gas stay put
  • Fastest and most predictable
  • Usually 5–7 weeks on site
Reconfigure

New layout

Sink, range or island moved; walls opened; windows changed. Where most of the function improves.

  • Bearing wall removal needs an engineered beam
  • Plumbing and venting rerouted
  • Usually 8–12 weeks on site
Expand

Kitchen + addition

A bump-out or rear addition that gives the kitchen the room it never had.

  • Foundation and exterior work
  • One permit, one schedule
  • See Home Additions for timing

Planning

Decisions to make before demolition

Bearing walls

Opening a kitchen to the living room often means a flush beam. We size it with an engineer and include it in the permit.

Electrical capacity

Induction ranges, double ovens and heat pumps add load. Many older homes need a panel upgrade.

Ventilation

Range hoods over 400 CFM require make-up air under Massachusetts code. Plan for it early.

Cabinet lead time

Semi-custom cabinets take 4–10 weeks. We order before demolition so the kitchen is not empty for a month.

Living without a kitchen

We set up a temporary sink and counter area so the house still works during the build.

Selections up front

Counters, tile, fixtures and appliances chosen before we start. Mid-job changes are what make kitchens late.

Timeline

How a kitchen remodel runs

  1. 1
    Week 1

    Site visit and layout

    Measurements, what is in the walls, and what you want the room to do.

  2. 2
    2–4 weeks

    Design, selections and estimate

    Layout drawing, cabinet design and an itemized written estimate.

  3. 3
    2–4 weeks

    Permits and ordering

    Building and trade permits filed; cabinets and long-lead items ordered.

  4. 4
    1 week

    Demolition and protection

    Dust walls, floor protection, demo down to the studs where needed.

  5. 5
    2–3 weeks

    Rough-ins and inspections

    Framing changes, plumbing, electrical, ventilation, then inspections.

  6. 6
    3–5 weeks

    Finishes

    Drywall, flooring, cabinets, templating and install of counters, tile, fixtures and appliances.

  7. 7
    Final

    Inspection and walkthrough

    Final sign-offs and a punch-list walk with you.

Cost

What a kitchen remodel costs on the South Shore

Refresh, same layout, mid-range finishes$55k – $85k
Full remodel with layout changes$85k – $140k
Open concept with structural beam$100k – $160k
High-end custom cabinetry and stone$150k+

What moves the price

  • Cabinet line: stock vs. semi-custom vs. custom
  • Moving the sink, range or gas line
  • Removing a bearing wall
  • Counter material and edge details
  • Panel upgrade or new circuits
  • Appliance package

Planning ranges only, not a quote. Appliances are often priced separately.

FAQ

Kitchen Remodeling: questions homeowners ask

How much does a kitchen remodel cost on the South Shore?

Most of our kitchen remodels fall between $55k and $140k. Keeping the layout is the biggest saving; moving plumbing or removing a bearing wall is the biggest cost increase.

How long will we be without a kitchen?

Typically 6–10 weeks of construction. We order cabinets before demolition and set up a temporary sink area so you are not without water.

Can you remove the wall between my kitchen and living room?

Usually, yes. If it is bearing, we install an engineered beam, often flush with the ceiling, and include it in the building permit.

Do I need a permit for a kitchen remodel?

In Massachusetts, yes for anything beyond cosmetic work: electrical, plumbing and structural changes all require permits and inspections. We pull them.

Do you help with design and selections?

Yes. We produce the layout and cabinet design, and guide you through counters, tile and fixtures with a clear allowance for each.

Service area

Kitchen Remodeling in Randolph and across the South Shore

Based at 42 Edwin Street in Randolph, we build kitchen remodeling in these towns and know how each building department works.

  • Kitchen Remodeling in Randolph, MA
  • Kitchen Remodeling in Braintree, MA
  • Kitchen Remodeling in Weymouth, MA
  • Kitchen Remodeling in Hingham, MA
  • Kitchen Remodeling in Hull, MA
  • Kitchen Remodeling in Cohasset, MA
  • Kitchen Remodeling in Scituate, MA
  • Kitchen Remodeling in Norwell, MA
  • Kitchen Remodeling in Hanover, MA
  • Kitchen Remodeling in Hanson, MA
  • Kitchen Remodeling in Pembroke, MA
  • Kitchen Remodeling in Marshfield, MA
  • Kitchen Remodeling in Duxbury, MA
  • Kitchen Remodeling in Kingston, MA
  • Kitchen Remodeling in Halifax, MA
  • Kitchen Remodeling in Plympton, MA
  • Kitchen Remodeling in Carver, MA
  • Kitchen Remodeling in Plymouth, MA

Free estimate

Tell us what you’re
thinking about building.

Three quick steps. We reply within one business day to book a free on-site visit.

  1. 1We call to understand the project
  2. 2We visit the house, free
  3. 3You get an itemized written estimate
ProjectDetailsContact
What are you planning?
A few details
Budget range (optional)
How do we reach you?
Call Free Estimate