ADUs · South Shore, MA

A second home on your lot, now allowed by right.

Since February 2025, Massachusetts lets most single-family homeowners build an accessory dwelling unit of up to 900 sq ft without a special permit. We design, permit and build them.

Max size900 sq ft*
Typical project6–10 months
Planning range$150k – $450k
Special permitNot required*

What changed

What the Massachusetts ADU law allows

The Affordable Homes Act, effective February 2, 2025, made one accessory dwelling unit per lot allowed by right in single-family zoning districts across Massachusetts. That means no special permit and no Zoning Board hearing for a protected-use ADU.

  • Up to 900 sq ft or half the gross floor area of the main house, whichever is smaller.
  • Towns cannot require the owner to live on site or that tenants be related.
  • Towns may still apply reasonable dimensional rules, site plan review and Title 5 septic requirements.
  • Minimum parking requirements are limited, especially near transit.

Every South Shore town has been updating its bylaws, so the details differ. We check yours on the first visit.

Detached accessory dwelling unit under construction

Types of ADU

Detached, attached or converted

Detached

Backyard cottage

A small separate house with its own foundation, utilities and entry. The most privacy and the highest cost.

  • New water, sewer/septic and electric runs
  • Needs yard space and setbacks
  • $250k–$450k typical
Attached

Attached ADU

An addition with its own entrance and full kitchen, sharing a wall with the main house.

  • Shares utilities, lowering cost
  • Can double as an in-law suite
  • $200k–$380k typical
Above garage

Garage apartment

Living space built over a new or existing garage.

  • Existing garage must carry the load
  • Fire separation required
  • $180k–$350k typical
Conversion

Basement or garage conversion

Existing space turned into a legal unit. The lowest cost per square foot when the space qualifies.

  • Egress, ceiling height and moisture decide feasibility
  • Fastest permit path
  • $120k–$220k typical

Feasibility

What decides whether an ADU works on your lot

Septic capacity

An ADU adds bedrooms. On Title 5 septic, the system may need to be upgraded or expanded.

Setbacks and lot coverage

Towns can still apply dimensional rules to a detached unit.

Utility routing

Distance to water, sewer and electric service drives detached ADU costs.

Separate systems

Its own heating and cooling (usually a heat pump) and often a separate electric meter.

Wetlands and flood zones

Conservation Commission review still applies near resource areas.

Rental plans

Short-term rental of ADUs can still be restricted by your town.

Timeline

From idea to move-in

  1. 1
    Week 1–2

    Feasibility visit

    Zoning, septic, utilities and where the unit can go.

  2. 2
    4–8 weeks

    Design and estimate

    Floor plan, elevations and an itemized estimate.

  3. 3
    4–10 weeks

    Permits

    Building permit, Board of Health if on septic, and any site plan review.

  4. 4
    4–7 months

    Construction

    Foundation, framing, utilities, finishes and final inspection.

Cost

What an ADU costs on the South Shore

Basement or garage conversion$120k – $220k
Above-garage apartment$180k – $350k
Attached ADU addition$200k – $380k
Detached backyard ADU$250k – $450k

What moves the price

  • Utility trenching distance
  • Septic upgrade
  • Foundation type
  • Full kitchen vs. kitchenette
  • Finish level

*Size limit and by-right status per M.G.L. c.40A §3 as amended in 2024. Your town bylaw details apply. Planning ranges only.

FAQ

Accessory Dwelling Units: questions homeowners ask

Do I need a special permit to build an ADU in Massachusetts?

Not for a protected-use ADU in a single-family zoning district since February 2, 2025. You still need a building permit and must meet your town’s reasonable dimensional and site rules.

How big can an ADU be?

Up to 900 sq ft or half the gross floor area of the main house, whichever is smaller. Towns may allow larger units by special permit.

Can I rent out my ADU?

Yes, long-term rental is allowed and towns cannot require the tenant to be related. Short-term rentals may still be restricted locally.

Do I have to live on the property?

The state law prohibits towns from requiring owner occupancy for protected-use ADUs.

What is the cheapest type of ADU?

Converting existing space, like a dry basement or a garage, is usually the cheapest, provided it can meet egress, height and moisture requirements.

Service area

Accessory Dwelling Units in Randolph and across the South Shore

Based at 42 Edwin Street in Randolph, we build accessory dwelling units in these towns and know how each building department works.

  • Accessory Dwelling Units in Randolph, MA
  • Accessory Dwelling Units in Braintree, MA
  • Accessory Dwelling Units in Weymouth, MA
  • Accessory Dwelling Units in Hingham, MA
  • Accessory Dwelling Units in Hull, MA
  • Accessory Dwelling Units in Cohasset, MA
  • Accessory Dwelling Units in Scituate, MA
  • Accessory Dwelling Units in Norwell, MA
  • Accessory Dwelling Units in Hanover, MA
  • Accessory Dwelling Units in Hanson, MA
  • Accessory Dwelling Units in Pembroke, MA
  • Accessory Dwelling Units in Marshfield, MA
  • Accessory Dwelling Units in Duxbury, MA
  • Accessory Dwelling Units in Kingston, MA
  • Accessory Dwelling Units in Halifax, MA
  • Accessory Dwelling Units in Plympton, MA
  • Accessory Dwelling Units in Carver, MA
  • Accessory Dwelling Units in Plymouth, MA

Free estimate

Tell us what you’re
thinking about building.

Three quick steps. We reply within one business day to book a free on-site visit.

  1. 1We call to understand the project
  2. 2We visit the house, free
  3. 3You get an itemized written estimate
ProjectDetailsContact
What are you planning?
A few details
Budget range (optional)
How do we reach you?
Call Free Estimate