Bathroom Remodeling · South Shore, MA

Bathrooms fail behind the tile. That is where we start.

Full gut remodels and targeted updates, waterproofed and ventilated properly so the shower still looks new in fifteen years.

Construction3–6 weeks
Planning range$28k – $90k
PermitsPlumbing + electrical
WaterproofingMembrane systems

What matters

The part you never see decides how long it lasts

When we open up a failing bathroom, the problem is almost never the tile. It is a shower pan without proper slope, green board instead of a waterproof membrane, or a fan vented into the attic. Those are invisible on day one and expensive in year five.

Every shower we build gets a continuous waterproofing membrane, a sloped mortar bed or pre-formed pan, and a fan ducted outside. Then we pick tile.

Shower waterproofing membrane installed before tile

Scope

Which bathroom project are you planning?

Update

Tub-to-shower conversion

Remove an unused tub and build a walk-in shower in the same footprint.

  • Often curbless
  • Glass panel instead of curtain
  • 2–3 weeks on site
Full gut

Hall or family bathroom

Down to the studs: new plumbing, waterproofing, tile, vanity, lighting and ventilation.

  • Durable finishes for kids and guests
  • Fixed layout keeps cost down
  • 3–5 weeks on site
Primary

Primary bathroom

Larger showers, double vanities, heated floors and better storage. Sometimes combined with closet space.

  • Layout changes common
  • Heated floor and steam options
  • 4–7 weeks on site
Accessible

Aging-in-place bathroom

Curbless entry, blocking for grab bars, comfort-height fixtures and wider doors, designed to look like a normal bathroom.

  • Plan blocking now, add bars later
  • Slip-resistant tile
  • Handheld shower on slide bar

Done right

What goes into every bathroom we build

Continuous waterproofing

Sheet or liquid membrane on shower walls and floor, lapped into the drain, tested before tile.

Proper slope to the drain

Mortar bed or pre-sloped pan. Linear drains for curbless showers.

Ventilation ducted outside

Correctly sized fan on a timer or humidity sensor, never dumped into the attic.

Plumbing updated while the walls are open

Pressure-balanced valves, new supply lines and shut-offs.

GFCI and lighting plan

Code-required GFCI protection, vanity lighting at face height, and a dimmable overhead.

Blocking for the future

Wood blocking in the walls for grab bars and accessories, even if you do not install them now.

Timeline

A typical bathroom remodel schedule

  1. 1
    Week 1

    Site visit and scope

    Measurements, what you want to change and what is behind the walls.

  2. 2
    1–3 weeks

    Selections, estimate and permits

    Tile, vanity and fixtures chosen; itemized estimate; plumbing and electrical permits.

  3. 3
    Days 1–3

    Demolition

    Dust protection, demo to studs, inspect subfloor and framing.

  4. 4
    Week 1–2

    Rough plumbing and electrical

    Valves, drains, wiring and fan duct, then rough inspections.

  5. 5
    Week 2–3

    Waterproofing and tile

    Membrane installed and flood-tested, then tile.

  6. 6
    Week 3–5

    Fixtures and finish

    Vanity, toilet, glass, trim and paint. Final inspection and walkthrough.

Cost

What a bathroom remodel costs on the South Shore

Tub-to-shower conversion$22k – $40k
Hall bathroom, full gut$32k – $55k
Primary bathroom remodel$50k – $90k+
Aging-in-place / curbless upgrade$35k – $65k

What moves the price

  • Moving the toilet or shower drain
  • Tile size and layout complexity
  • Glass enclosure type
  • Heated floors and steam
  • Subfloor or framing repairs found at demo

Planning ranges only, not a quote.

FAQ

Bathroom Remodeling: questions homeowners ask

How long does a bathroom remodel take?

Usually 3–5 weeks of construction once materials are on site. Primary bathrooms with layout changes can take 6–7 weeks.

How much does a bathroom remodel cost on the South Shore?

A hall bathroom full gut typically runs $32k–$55k; a primary bathroom $50k–$90k or more. Keeping the drains where they are saves the most.

Do I need a permit to remodel a bathroom in Massachusetts?

Yes for plumbing and electrical work. Licensed trades pull those permits and the work is inspected before walls are closed.

What waterproofing do you use?

Continuous membrane systems such as Schluter KERDI or liquid-applied membranes, flood-tested before tile goes on.

Can I use the house during the remodel?

Yes. If it is your only bathroom, tell us and we will plan the schedule to keep a toilet working as much as possible.

Service area

Bathroom Remodeling in Randolph and across the South Shore

Based at 42 Edwin Street in Randolph, we build bathroom remodeling in these towns and know how each building department works.

  • Bathroom Remodeling in Randolph, MA
  • Bathroom Remodeling in Braintree, MA
  • Bathroom Remodeling in Weymouth, MA
  • Bathroom Remodeling in Hingham, MA
  • Bathroom Remodeling in Hull, MA
  • Bathroom Remodeling in Cohasset, MA
  • Bathroom Remodeling in Scituate, MA
  • Bathroom Remodeling in Norwell, MA
  • Bathroom Remodeling in Hanover, MA
  • Bathroom Remodeling in Hanson, MA
  • Bathroom Remodeling in Pembroke, MA
  • Bathroom Remodeling in Marshfield, MA
  • Bathroom Remodeling in Duxbury, MA
  • Bathroom Remodeling in Kingston, MA
  • Bathroom Remodeling in Halifax, MA
  • Bathroom Remodeling in Plympton, MA
  • Bathroom Remodeling in Carver, MA
  • Bathroom Remodeling in Plymouth, MA

Free estimate

Tell us what you’re
thinking about building.

Three quick steps. We reply within one business day to book a free on-site visit.

  1. 1We call to understand the project
  2. 2We visit the house, free
  3. 3You get an itemized written estimate